Vacuum Excavation Within a Rail Possession
Rail infrastructure contractor
Representative capability example of work Dynamic delivers. Client names and project specifics are published only with client approval.
The challenge
Excavation was required around sensitive rail assets within a limited possession window, where mechanical digging carried unacceptable risk.
Our solution
High-capacity vacuum units and tanker support were deployed to expose assets and recover material efficiently within the possession.
Safety considerations
Crews worked to the rail environment's controls, using vacuum excavation to protect signalling and communications assets.
What this work delivers
Excavation is staged so each location is completed and made safe inside the possession window, which is what allows a rail corridor to be handed back on time.